CLIENT: HDR, Inc. / FDOT District III

The SR 79 over Holmes Creek Bridge Replacement Project included the replacement of the existing two lane bridge with a pair of two lane bridges and associated approaches. EGS performed the Geotechnical Investigation for the FDOT District III Material Office in conjunction with bridge design, which was conducted by HDR, Inc.  Due to highly variable subsurface conditions, the bridge will be placed on two different types of deep foundations, which include 24-in steel pipe piles placed in groups, and 72-in drilled shafts.   EGS provided assistance in developing Plans, Notes, and Additional Specifications for the unique design.

For more information, or for a cost proposal for your next project, please contact our EGS Design Engineers at Office@EGS-US.COM.