CLIENT: American Consulting Engineers (ACE), LLC. / FDOT District III

The SR 10 (US 90) over Perdido River Bridge Replacement Project included the replacement of the existing structure with a single two lane bridge and associated approaches. EGS performed the Geotechnical Investigation for American Consulting Engineers (ACE), Inc.  The replacement structure is approximately 742 feet in length with nine spans.  Due to the significantly high fill required for the new approaches and the existence of deep layers of organic and soft clays the embankment required preloading and monitoring.  EGS developed the monitoring plan and Technical Special Provision (TSP) for the necessary settlement plates.

For more information, or for a cost proposal for your next project, please contact our EGS Design Engineers at Office@EGS-US.COM.